The Tide, by Diller Scofidio + Renfro

This project opened in July 2019, on Greenwich Peninsula, London. More information here.

I worked alongside the design and computation team within Diller Scofidio + Renfro and Neiheiser Argyros, as we jointly developed parametric geometric models that defined the forms of the elevated walkway ‘Islands’ and Bridges.

In parallel, I also created a series of synchronised parametric engineering models, that helped our team within AKT II to carry out structural analysis and optimisation studies.

More images and information to follow once the project is open.

 

Project Team:

Client: Knight Dragon
Designer (Lead): Diller Scofidio + Renfro
Designer: Neiheiser Argyros

Structural Engineer (Elevated Walkway): AKT II
Fabricator: Cimolai
Landscape Designer: Gross Max

Project Role: Computational Designer at AKT II

 

InstagramLinkedInVimeoGrasshopper

 

Return to Top of page